5300
NE 24th Terrace, Fort Lauderdale, Florida

STRUCTURAL
INSPECTION REPORT :
CONCRETE DAMAGE ASSESSMENT REPORT:
- Inspected the concrete walkway exterior slab measuring 5 feet in width and
5 inches in thickness.Found numerous top concrete spalling areas exposed
rusted top mat steel bars .
- Evaluation and Recommendations:
Reference technical specifications titled: " Concrete slab
repairs and spalling areas" for detailed procedures and technical
information regarding the repair of the above units.
The contractor must submit his work schedule to the owner and engineer for
approval prior to commencing repair work. Additionally, the contractor must
apply for permits and submit a work plan in advance of the work schedule.
All work must be coordinated with the property manager and employ high
standards of conduct to minimize tenant disturbance including but not limited to
noise, dust, dirt and trash.
The work area and all access areas and elevators must be kept clean at all
times, and advance work schedule must be submitted in writing prior to each days
work.
All repair work must be inspected by the engineering staff prior, and during
construction to insure compliance with the approved technical specifications and
repair procedures.
Technical specifications for the repair of the spalled concrete and rusted
steel in balconies.
A site assessment and evaluation of each unit including inspection,
photos, and measurements for each damaged area.
Site on the job Inspection and monitoring of work performed by contractor
to insure compliance with contract specifications for concrete repair.
Inspection of work in progress documented by a daily report of inspection
and project photos.
Certified Inspection report containing materials used and adherence to
project specifications, signed and sealed. ( Upon completion and approval of
work)
Project photos containing damaged areas of the concrete slab
Detailed drawings
Based upon a review of the existing building condition based on visual observations of the building structure, we offer the following
opinions:
- Due to the nature of the top mat #5 reinforcing bar having a cover of 1/4"
- ½ inch or less in
some instances, the water being drained from the balcony surface is seeping
around the slab edge into the concrete mass causing rust and oxidation to the
reinforcing steel bars. The reinforcing bar is expanding in volume causing
cracks and spalling to the concrete and stucco.
- Due to the concrete cover being 1/4" or less, and due to the expansion and
contraction thermal effects, the concrete top cover being so thin, caused
cracks as a result of weak bond, therefore, compounded effect of spalling and
cracking noticeable at the surface.
- The cracks detected along the balcony slabs may also be due to compressive
structural failure of the concrete slab and the following :
- The compressive strength of the concrete is below the design value as
noted in the contract plans and specifications
- The reinforcement in the slab in the form of #5 @ 7-8" on center may not be
sufficient to resist tension as a result of dead and live loads
- Clearance to the reinforcing steel bars and water intrusion due to heavy
rain fall and insufficient drainage provisions caused deterioration of the
slab and spalling
- As a result of water seepage and since concrete slabs are porous and may
not be sealed properly, water intrusion inside the concrete have rusted the
rebars , causing expansion of concrete mass, cracking and loss in tension
forces.
- Recommendations and Solutions:
We recommend immediate repairs to the damaged concrete and rusted steel
elements as described herein above in accordance with the engineered technical
specifications, South Florida Building Code, local codes and design sketches.
The contractor must employ competent workers to comply with "OSHA"
requirements and maintain safe working conditions to all persons involved. All
areas affected by construction and repairs must be sealed off and protected
from falling debris and tools.
As illustrated above, the referenced buildings exhibited structural damage as
well as water problems due to several factors listed. We recommend that
immediate repairs and inspections be conducted as described in items above
"Recommendations and Solutions".
The structural damage to the concrete balconies and water drainage problems
must be corrected immediately to minimize further damage to the structure. Delay
in desperately needed repairs will result in compounded additional cost which
will be minimized upon proper and correct solutions.
| DATE OF
INSPECTIONS |
AREA
INSPECTED |
UNIT NUMBER |
FINDINGS |
RECOMMENDATIONS |
| APRIL 16 16, 2002 |
CONCRETE BALCONY SLAB inspection and
measurements |
Building "C" - Floors 1 through 4 |
STEEL MUST BE LOWERED @TOP#5 BARS, ATTACH
TAPCONS AND DOWEL BAR TO REPLACE damaged BARS,EPOXY 4" IN SLAB |
CONTRACTOR MUST REPAIR AS PER ENGINEER'S
RECOMMENDATIONS |
| APRIL 17, 2002 |
CONCRETE BALCONY SLAB inspection and
measurements |
Building "A" - Floors 1 through 4 |
STEEL MUST BE LOWERED @TOP#5 BARS, ATTACH
TAPCONS AND DOWEL BAR TO REPLACE damaged BARS,EPOXY 4" IN SLAB |
CONTRACTOR MUST REPAIR AS PER ENGINEER'S
RECOMMENDATIONS |
|
APRIL 18, 2002 |
CONCRETE BALCONY SLAB inspection and
measurements |
Buildings "A" & "C" - Floors 1 through 4 |
Performed Schmidt hammer compressive concrete
tests |
Under analysis and investigation |
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
Photos Taken @ 10:00 to 11:30 AM, Friday April 12,
2002
      
      