Donn Eisele Sea Wall project-
Wilton Manors, Florida
click to enlarge
701 NW 29th street, Florida
Sea Wall Design-
- The original Sea Wall was composed of Rip-Rap Rubble built around
1961
- In 2001, Existing Sea Wall was damaged beyond repair
- New sea wall was planned to be part of a recreation park for the city of
Wilton manors
- The construction schedule was shortened by 5 weeks due to innovative
design structure
Key Benefits
- Enhanced sea wall durable structure composed of sand cement rip rap
- Existing endangered species trees were to remain adjacent to the sea wall
- Water way was to be protected as per EPA regulations
- Increased Sea Wall Capacity and the elimination of forming and labor cost
- Increased natural beauty to blend with the surrounding environment and
park theme
- Increased boating side dock area
- Durable construction connections meeting hurricane uplift