Donn Eisele Sea Wall project- Wilton Manors, Florida

   click to enlarge

   701 NW 29th street, Florida
   Sea Wall Design-

  • The original Sea Wall was composed of Rip-Rap Rubble built around  1961
  • In 2001, Existing Sea Wall was damaged beyond repair
  • New sea wall was planned to be part of a recreation park for the city of Wilton manors
  • The construction schedule was shortened by 5 weeks due to innovative design structure

Key Benefits

  • Enhanced sea wall durable structure composed of sand cement rip rap
  • Existing endangered species trees were to remain adjacent to the sea wall
  • Water way was to be protected as per EPA regulations
  • Increased Sea Wall Capacity and the elimination of forming and labor cost
  • Increased natural beauty to blend with the surrounding environment and park theme
  • Increased boating side dock area
  • Durable construction connections meeting hurricane uplift
                                         