![]() |
||||||
| Home
Page
Home Services Background Profile Projects Gallery
|
Valet Storage : 120,000 SF Design of concrete foundations: 4,812,200 Cubic Foot concrete Structural Design analysis and calculations for a (6) story Building - Concrete columns, Filegree precast pre stressed concrete system, post tensioned system with middle strip beams and a grid system. Concrete members, and footings. Also Performed Threshold Inspections from foundations, shear walls, columns, slab to Unit Masonry construction. Challenges: 1) Project was to be finished in 12 weeks from start to finish 2) Deadline: Due to innovative approach, by utilizing state of the art experienced engineering staff, and computer software, the design from concept to completion was completed in 3 weeks 3) Project engineering documents included: Full set of structural engineering and shop drawings (28 sheets), Technical specifications, inspections and testing quality control plan, Scheduling with Architect for submittals and shop drawings review 4) RFI's management: was performed using Information systems and website technology 5) Results: Contractor savings: $750,000 in materials, schedule and labor
Send mail to Chaiban@microsoft.com with questions or
comments about this web site.
|
Structural
Design and Inspections
Sea
|